BCS completed the Level 3 mechanical fit-out, incorporating modifications to the existing HVAC system, including PPR and copper chilled water pipework, ductwork alterations, FCU relocations, E4M controls upgrades, sensor modifications, and BMS integration. The works concluded with full testing, balancing, commissioning, and system optimisation to ensure design performance objectives were achieved.