Levy Building

This fast-tracked HVAC upgrade involved the complete replacement of the existing VRF system with a new Mitsubishi Electric HVRF across three floors of the historic Levy Building. The project included demolition of existing services, installation of new indoor and outdoor units, refrigerant pipework, ventilation upgrades, E4M/BMS controls integration, power and water monitoring, and full testing, commissioning, and balancing. Despite challenging site constraints and compressed delivery timeframes, the project was successfully completed and commissioned to meet operational and performance requirements.